Client Portal Telemetry

Live Engineering Project & Lead Tracker

Enter your Lead ID or Client Member ID (e.g. RS-LEAD-88421) to view real-time site survey status, CAD drawings, and installation progress.

Track Your Facility Infrastructure Progress

Enter your 8-character Lead ID provided during assessment submission or in your email confirmation.

💡 Don't have a Lead ID? Click Load Demo Project (RS-LEAD-88421)
ID: RS-LEAD-88421

Turnkey 60 TR Cleanroom HVAC & 250 kVA Substation

Client: Acme Pharma Labs • Location: Baddi Industrial Belt, HP
● Phase 3: BOQ Proposal Issued
✓
Request Received
Aug 18, 2026
✓
Site Survey Done
Aug 19, 2026
3
BOQ Dispatched
In Progress
4
Panel Assembly
Scheduled
5
SAT Commissioning
Scheduled

Engineering Log & Document Checklist

  • ✅ ASHRAE 90.1 Heat Load Calculation: Passed (50.8 TR Net Cooling)
  • ✅ Single Line Diagram (SLD) 250kVA: Approved by Lead Electrical Engineer
  • ⚡ Current Milestone: Technical BOQ Commercial Review & Client Site Handover Schedule
  • 📞 Assigned Project Engineer: Er. Sukhman P. Singh (+91 62399-13625)
Speak to Assigned Engineer →