A 140,000 sq ft automotive forging and precision engineering facility in Focal Point Phase 7, Ludhiana, was suffering from acute heat accumulation, oil mist contamination, and frequent thermal tripping on production CNC lines during 44°C peak summer operations under legacy single-pass ventilation.
RS Electricals engineered and executed a turnkey 450 TR central chilled water system with modulating primary-secondary variable pumping, a 30,000 CFM double-skin ducted air washer network with oil-mist electrostatic precipitation, and custom APFC panels with 7% detuned copper reactors to eliminate IEEE 519 harmonic feedback on PSPCL lines.