Decarbonizing industrial plants, hospitals, and commercial real estate across North India. We combine certified BEE energy auditing with turnkey MEP EPC execution, cutting utility bills by 25% to 40% with guaranteed ROI payback.
Unlike pure-play consulting firms that hand over theoretical PDF reports, RS Electricals & HVAC Solutions owns the Class-A electrical licenses, heavy tools, and engineering crews to physically execute, wire, re-pipe, and commission every energy-saving recommendation.
See the immediate annual financial savings and carbon abatement achievable through RS Electricals' AI HVAC and chiller optimization.
Review of 24-month electricity billing (PSPCL/DHBVN), peak demand penalty history, contract demand vs actual load, and single-line diagrams (SLD).
7 to 14 days of continuous high-speed logging: Power Quality (THD, PF, unbalance), chiller kW/TR logging, water flow rates, and thermal imaging scans.
Presentation of bankable techno-commercial report detailing CAPEX, OPEX reduction, Simple Payback, Net Present Value (NPV), and Internal Rate of Return (IRR).
Supply, installation, cabling, and commissioning of retrofits, followed by IPMVP-compliant Measurement and Verification guaranteeing expected power savings.
| Regulatory Framework | Issuing Body | Mandatory RS Engineering Checkpoints |
|---|---|---|
| ECBC 2017 & Eco-Niwas Samhita | Bureau of Energy Efficiency (BEE) | Building envelope U-values, minimum HVAC COP (>3.50 DX, >6.1 Centrifugal), Interior Lighting Power Density (LPD <0.5 W/sq.ft). |
| IGBC Green Factory & Buildings | Confederation of Indian Industry (CII) | Sub-metering on 100% major electrical loads, solar PV integration, low-VOC materials, 30% reduction over baseline energy model. |
| IEEE 519-2022 | IEEE Power & Energy Society | Harmonic control in electric power systems. Total Harmonic Distortion THD-V < 5.0%, THD-I < 8.0% at Point of Common Coupling (PCC). |
| IS 16168 / ISO 18434-1 | Bureau of Indian Standards (BIS) | Thermal imaging condition monitoring. Temperature delta (ΔT) classification for electrical connections (<10°C normal, >30°C critical intervention). |
| ASHRAE 90.1 & ASHRAE 62.1 | ASHRAE Global | Energy Standard for Buildings except Low-Rise Residential & Ventilation for Acceptable Indoor Air Quality (IAQ CFM requirements). |
By dynamically tracking thermal mass, integrating live weather forecasts, automating VAV occupancy zones, and continuously optimizing chiller plant COP, our AI climate control delivers 25% to 40% reduction in HVAC power bills with an average payback of under 3 years.
An Energy Audit identifies energy waste, harmonics, and thermal leaks through calibrated instruments. An ESCO (Energy Service Company) retrofit takes it to turnkey implementation: RS procures, installs, and commissions high-efficiency VFD chillers, smart panels, and BMS, guaranteeing that energy savings pay back the investment.
Yes. As a turnkey MEP contractor with certified IGBC AP engineers, we design and commission the exact HVAC, electrical, solar, and water systems required to satisfy mandatory LEED v4.1/v5 and IGBC Green Factory/Building energy performance credits.
Most unoptimized central chiller plants run at 0.75 to 0.90 kW/TR. Through dynamic chilled water supply temperature (CHWST) and condenser water temperature (CWST) resets, primary-secondary variable speed pumping, and AI load balancing, we drive chiller plant performance down below 0.50 kW/TR, saving tens of lakhs annually.
Speak directly with our Chief Energy Auditor and Senior MEP Consultants to book your comprehensive on-site facility audit.