IGBC • LEED • BEE ACCREDITED • ESCO MODEL

Green Building EPC &
Statutory Energy Audits

Decarbonizing industrial plants, hospitals, and commercial real estate across North India. We combine certified BEE energy auditing with turnkey MEP EPC execution, cutting utility bills by 25% to 40% with guaranteed ROI payback.

Schedule Statutory Energy Audit → Consult on WhatsApp
25% – 40%
Guaranteed Electricity Savings
< 3.0 Years
Average Simple Payback (ESCO)
< 0.50 kW/TR
Optimized Chiller Plant COP
100% Turnkey
Audit → Design → EPC Execution
Engineering Portfolio

Complete Decarbonization & Sustainability Scope

Unlike pure-play consulting firms that hand over theoretical PDF reports, RS Electricals & HVAC Solutions owns the Class-A electrical licenses, heavy tools, and engineering crews to physically execute, wire, re-pipe, and commission every energy-saving recommendation.

🌿 IGBC & LEED Green Building Facilitation
Comprehensive MEP engineering for IGBC (Platinum, Gold, Silver), LEED v4.1/v5 (BD+C, O+M), and GRIHA ratings. We manage baseline energy modeling (ASHRAE 90.1), indoor environmental quality (ASHRAE 62.1 & 55), daylight harvesting simulations, and mandatory Commissioning (Cx) documentation.
📊 BEE Grade-1 Statutory Energy Audits
Bureau of Energy Efficiency (BEE) certified industrial and commercial audits. Detailed assessment using calibrated Class 0.2 power quality analyzers, ultrasonic hydronic flowmeters, flue gas analyzers, and anemometers to deliver bankable Investment Grade Audit (IGA) reports.
❄️ AI-Driven Chiller Plant COP Optimization
Compressing central cooling power consumption from traditional 0.80 kW/TR down to <0.50 kW/TR. Implementing dynamic Chilled Water Supply Temperature (CHWST) and Condenser Water Temperature (CWST) resets, primary-variable pumping, and magnetic bearing oil-free chillers.
⚡ Power Quality & IEEE 519 Harmonic Mitigation
Active Harmonic Filter (AHF) and detuned capacitor bank installation ensuring Total Harmonic Distortion (THD-V < 5%, THD-I < 8%) meets stringent PSPCL, HVPNL, and IEEE 519 regulatory grid standards, eliminating motor overheating and transformer core losses.
🔍 Thermal Imaging & Envelope Diagnostics (IS 16168)
High-resolution infrared thermography scanning HT/LT switchgear, busduct joints, capacitor banks, and building envelopes. Locates high-resistance hotspots, thermal bridges, and conditioned air leakages without taking plant machinery offline.
💼 Guaranteed ESCO Performance Contracting
Zero or minimal upfront capital expenditure model. RS Electricals finances, procures, installs, and commissions high-efficiency VFD chillers, smart lighting, and BMS automation, with project costs recovered directly through guaranteed monthly power bill savings.

Calculate Your Facility's Decarbonization ROI

See the immediate annual financial savings and carbon abatement achievable through RS Electricals' AI HVAC and chiller optimization.

Annual Electricity Saved
306,600 kWh
Annual Rupee Savings
₹ 26.06 Lakhs
CO2 Emissions Abated
251 Metric Tons
Estimated Simple Payback
2.2 Years
Lock in These Savings – Request On-Site Audit →
Proven Methodology

The RS 4-Stage Decarbonization Protocol

STAGE 01

Walkthrough & Utility Baselining

Review of 24-month electricity billing (PSPCL/DHBVN), peak demand penalty history, contract demand vs actual load, and single-line diagrams (SLD).

STAGE 02

Calibrated Diagnostics & Logging

7 to 14 days of continuous high-speed logging: Power Quality (THD, PF, unbalance), chiller kW/TR logging, water flow rates, and thermal imaging scans.

STAGE 03

Investment Grade Audit (IGA)

Presentation of bankable techno-commercial report detailing CAPEX, OPEX reduction, Simple Payback, Net Present Value (NPV), and Internal Rate of Return (IRR).

STAGE 04

Turnkey EPC & Measurement (M&V)

Supply, installation, cabling, and commissioning of retrofits, followed by IPMVP-compliant Measurement and Verification guaranteeing expected power savings.

National & International Compliance Standards

Regulatory Framework Issuing Body Mandatory RS Engineering Checkpoints
ECBC 2017 & Eco-Niwas Samhita Bureau of Energy Efficiency (BEE) Building envelope U-values, minimum HVAC COP (>3.50 DX, >6.1 Centrifugal), Interior Lighting Power Density (LPD <0.5 W/sq.ft).
IGBC Green Factory & Buildings Confederation of Indian Industry (CII) Sub-metering on 100% major electrical loads, solar PV integration, low-VOC materials, 30% reduction over baseline energy model.
IEEE 519-2022 IEEE Power & Energy Society Harmonic control in electric power systems. Total Harmonic Distortion THD-V < 5.0%, THD-I < 8.0% at Point of Common Coupling (PCC).
IS 16168 / ISO 18434-1 Bureau of Indian Standards (BIS) Thermal imaging condition monitoring. Temperature delta (ΔT) classification for electrical connections (<10°C normal, >30°C critical intervention).
ASHRAE 90.1 & ASHRAE 62.1 ASHRAE Global Energy Standard for Buildings except Low-Rise Residential & Ventilation for Acceptable Indoor Air Quality (IAQ CFM requirements).

Frequently Asked Questions

How much electricity can AI-powered climate control save in commercial buildings?

By dynamically tracking thermal mass, integrating live weather forecasts, automating VAV occupancy zones, and continuously optimizing chiller plant COP, our AI climate control delivers 25% to 40% reduction in HVAC power bills with an average payback of under 3 years.

What is the difference between an Energy Audit and an ESCO Retrofit?

An Energy Audit identifies energy waste, harmonics, and thermal leaks through calibrated instruments. An ESCO (Energy Service Company) retrofit takes it to turnkey implementation: RS procures, installs, and commissions high-efficiency VFD chillers, smart panels, and BMS, guaranteeing that energy savings pay back the investment.

Can RS Electricals assist with IGBC and LEED certification in Punjab and Baddi?

Yes. As a turnkey MEP contractor with certified IGBC AP engineers, we design and commission the exact HVAC, electrical, solar, and water systems required to satisfy mandatory LEED v4.1/v5 and IGBC Green Factory/Building energy performance credits.

How does Chiller Plant COP Optimization work?

Most unoptimized central chiller plants run at 0.75 to 0.90 kW/TR. Through dynamic chilled water supply temperature (CHWST) and condenser water temperature (CWST) resets, primary-secondary variable speed pumping, and AI load balancing, we drive chiller plant performance down below 0.50 kW/TR, saving tens of lakhs annually.

Decarbonize Your Facility & Slash Utility Tariffs

Speak directly with our Chief Energy Auditor and Senior MEP Consultants to book your comprehensive on-site facility audit.

Book Statutory Energy Audit → Call Direct: +91 62399-13625